Texas

EV charger installation in
Texas.

Texas EV adoption is surging. Get a Level 2 home charger installed with a licensed local electrician; we check your eligibility for utility rebates from Austin Energy, CPS Energy, and more.

Texas is the second-fastest-growing EV market in the US, with Tesla, Ford, and Rivian leading registrations.

Texas rebates & incentives

Save on your installation

We check your eligibility for every applicable rebate and include them in your final quote.

Austin Energy EV Rebate

Residential rebate for Level 2 charger purchase and installation

Up to $1,200

CPS Energy (San Antonio)

Residential EV charger rebate for CPS Energy customers

Up to $500

Oncor Take a Charge

Rebate for Oncor service territory customers installing Level 2 chargers

Up to $250

Federal Tax Credit (30C)

30% of charger + installation cost, up to $1,000 for residential

Up to $1,000

Chargers

Three chargers. Pick your speed.

All models include a J1772 connector (NACS adapter for Tesla included), weatherproof housing, and UL listing.

Ladegrid Charge Core 40

Budget-friendly plug-in Level 2 home charger

$349

  • 9.6 kW / 40A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Plug-in NEMA 14-50 installation
  • LED status indicator
  • NEMA 4 weatherproof rated
Get installed price
Most Popular

Ladegrid Charge Home 48

Smart Wi-Fi home charger with Bluetooth

$499

  • 11.5 kW / 48A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Hardwired or NEMA 14-50 plug-in installation
  • Wi-Fi + Bluetooth app control and scheduling
  • Smart load management
Get installed price

Ladegrid Charge Pro

Commercial-grade smart charger for multifamily and fleets

$899

  • 11.5 kW / 48A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Wi-Fi + Ethernet app control
  • OCPP 1.6J compatible
  • RFID access control
Get installed price

Installing in Texas

What to know before your install

Texas heat means outdoor chargers should be rated NEMA 4 or higher, and all Ladegrid models qualify

Many Texas homes have 200A panels, but older homes may need an upgrade for 48A+ charging

No state permit requirement, but most cities (Houston, Dallas, Austin, San Antonio) require local electrical permits

Typical installation turnaround: 3–7 business days from quote approval

Climate considerations

Texas summers push 100°F+. Ladegrid chargers are rated for extreme heat operation. Charge overnight during off-peak TDU rates for maximum savings.

Utilities we work with

Austin EnergyCPS EnergyOncorCenterPointAEP Texas

Ready to charge at home
in Texas?

Get an instant estimate, then a site-specific quote from a licensed local installer. We handle rebate eligibility, permitting, and financing options.