Florida

EV charger installation in
Florida.

Florida's EV market is growing fast. Get a Level 2 home charger installed by a licensed electrician; we help with FPL, Duke Energy, and TECO rebate eligibility.

Florida is the third-largest EV market in the US, with strong growth in Miami-Dade, Broward, and Tampa metro areas.

Florida rebates & incentives

Save on your installation

We check your eligibility for every applicable rebate and include them in your final quote.

FPL EVolution Program

Florida Power & Light residential charger rebate

Up to $500

Duke Energy FL Rebate

Duke Energy Florida residential Level 2 charger incentive

Up to $500

TECO EV Rebate

Tampa Electric Company rebate for home charger installation

Up to $400

Federal Tax Credit (30C)

30% of charger + installation cost, up to $1,000 for residential

Up to $1,000

Chargers

Three chargers. Pick your speed.

All models include a J1772 connector (NACS adapter for Tesla included), weatherproof housing, and UL listing.

Ladegrid Charge Core 40

Budget-friendly plug-in Level 2 home charger

$349

  • 9.6 kW / 40A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Plug-in NEMA 14-50 installation
  • LED status indicator
  • NEMA 4 weatherproof rated
Get installed price
Most Popular

Ladegrid Charge Home 48

Smart Wi-Fi home charger with Bluetooth

$499

  • 11.5 kW / 48A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Hardwired or NEMA 14-50 plug-in installation
  • Wi-Fi + Bluetooth app control and scheduling
  • Smart load management
Get installed price

Ladegrid Charge Pro

Commercial-grade smart charger for multifamily and fleets

$899

  • 11.5 kW / 48A Level 2 charging
  • J1772 connector (universal, includes Tesla NACS adapter)
  • Wi-Fi + Ethernet app control
  • OCPP 1.6J compatible
  • RFID access control
Get installed price

Installing in Florida

What to know before your install

Florida humidity and salt air make weatherproofing critical, and all Ladegrid models are NEMA 4/4X rated

Hurricane-prone areas benefit from indoor (garage) installation when possible

Most Florida counties require an electrical permit for 240V circuit installation

Typical turnaround from quote to installation: 5–10 business days

Climate considerations

Florida's heat and humidity demand robust weatherproofing. Ladegrid chargers handle it, but garage installation extends equipment life in coastal areas.

Utilities we work with

FPLDuke Energy FloridaTECOJEAGulf Power

Ready to charge at home
in Florida?

Get an instant estimate, then a site-specific quote from a licensed local installer. We handle rebate eligibility, permitting, and financing options.